Armed Forces Retirement Home

Schedules

TAFS: 084-8522 /X - Armed Forces Retirement Home

Iterations:
Adjustment authority: No
Reporting categories: No
Previously Approved (Iteration 1)Current OMB Action (Iteration 2)
Line #SplitDescriptionAmount FootnotesAmountFootnotes
1000DADiscretionary - Actual Unob Bal: Brought forward, October 1Line added $12,106,567.00
1000DEDiscretionary - Estimated Unob Bal: Brought forward, October 1$17,122,767.00
1061Unob Bal: Antic recov of prior year unpd/pd obl$500,000.00 $500,000.00
1101BA: Disc: Appropriation (special or trust)Line added $84,300,000.00
1134BA: Disc: Appropriations precluded from obligationLine added
1920Total budgetary resources avail (disc. and mand.)$17,622,767.00 See footnotes below $96,906,567.00 See footnotes below
Footnotes for line 1920 (Previous):

B1: The majority of the funds will be used for the listed projects: 1) Water and Sewer Replacement (Phase 1 West Campus Water Lines) on DC Campus 2) Water and Sewer Replacement (Phase 2 & 3 East Campus Water Lines and Southern Campus Storm Water Pipes) on DC Campus 3) Electrical Infrastructure Network Replacement (Phase 3 Purchase and Install remaining mid voltage switch gear in Sheridan and west vault) on DC Campus 4) Repair and replace slate roofs on historic buildings on DC Campus 5) Repair masonry on historic buildings on DC Campus causing water infiltration and energy loss 6) Replace primary and backup Gulfport generators impacted by lightning, hurricane, and saltwater damage 7) Replace Gulfport boilers due to salt corrosion 8) Replace outdated and malfunctioning emergency alert system at both Campuses

B2: Pursuant to the authority in OMB Circular A-11 section 120.21, one or more lines on the apportionment (including lines above line1920) may have been round up and as such, those rounded lines will not match the actuals reported on the SF-133. Agency will ensure that its funds control system will only allot actuals.

Footnotes for line 1920 (Current):

B1: The majority of the funds will be used for the listed projects: 1) Water and Sewer Replacement (Phase 1 West Campus Water Lines) on DC Campus 2) Water and Sewer Replacement (Phase 2 & 3 East Campus Water Lines and Southern Campus Storm Water Pipes) on DC Campus 3) Electrical Infrastructure Network Replacement (Phase 3 Purchase and Install remaining mid voltage switch gear in Sheridan and west vault) on DC Campus 4) Repair and replace slate roofs on historic buildings on DC Campus 5) Repair masonry on historic buildings on DC Campus causing water infiltration and energy loss 6) Replace primary and backup Gulfport generators impacted by lightning, hurricane, and saltwater damage 7) Replace Gulfport boilers due to salt corrosion 8) Replace outdated and malfunctioning emergency alert system at both Campuses

B2: Pursuant to the authority in OMB Circular A-11 section 120.21, one or more lines on the apportionment (including lines above line1920) may have been round up and as such, those rounded lines will not match the actuals reported on the SF-133. Agency will ensure that its funds control system will only allot actuals.

6011Capital$17,622,767.00 $19,906,567.00
6012Sheridan Building RenovationLine added $77,000,000.00
6190Total budgetary resources available$17,622,767.00 $96,906,567.00

Footnotes

Footnotes provide further information about, or establish further legal requirements related to the use of, the funds in a given line or set of lines in an apportionment. If footnotes appear on lines 1920 or 6190, they apply to all the lines in the 1xxx and 6xxx sections, respectively. The following are all the footnotes associated with this file.

NumberText
B1
The majority of the funds will be used for the listed projects: 1) Water and Sewer Replacement (Phase 1 West Campus Water Lines) on DC Campus 2) Water and Sewer Replacement (Phase 2 & 3 East Campus Water Lines and Southern Campus Storm Water Pipes) on DC Campus 3) Electrical Infrastructure Network Replacement (Phase 3 Purchase and Install remaining mid voltage switch gear in Sheridan and west vault) on DC Campus 4) Repair and replace slate roofs on historic buildings on DC Campus 5) Repair masonry on historic buildings on DC Campus causing water infiltration and energy loss 6) Replace primary and backup Gulfport generators impacted by lightning, hurricane, and saltwater damage 7) Replace Gulfport boilers due to salt corrosion 8) Replace outdated and malfunctioning emergency alert system at both Campuses
B2
Pursuant to the authority in OMB Circular A-11 section 120.21, one or more lines on the apportionment (including lines above line1920) may have been round up and as such, those rounded lines will not match the actuals reported on the SF-133. Agency will ensure that its funds control system will only allot actuals.

The following are all of the footnotes associated with the previous iteration of this file. Note that previous iterations of accounts in this file may come from multiple previous files.

NumberText
B1
The majority of the funds will be used for the listed projects: 1) Water and Sewer Replacement (Phase 1 West Campus Water Lines) on DC Campus 2) Water and Sewer Replacement (Phase 2 & 3 East Campus Water Lines and Southern Campus Storm Water Pipes) on DC Campus 3) Electrical Infrastructure Network Replacement (Phase 3 Purchase and Install remaining mid voltage switch gear in Sheridan and west vault) on DC Campus 4) Repair and replace slate roofs on historic buildings on DC Campus 5) Repair masonry on historic buildings on DC Campus causing water infiltration and energy loss 6) Replace primary and backup Gulfport generators impacted by lightning, hurricane, and saltwater damage 7) Replace Gulfport boilers due to salt corrosion 8) Replace outdated and malfunctioning emergency alert system at both Campuses
B2
Pursuant to the authority in OMB Circular A-11 section 120.21, one or more lines on the apportionment (including lines above line1920) may have been round up and as such, those rounded lines will not match the actuals reported on the SF-133. Agency will ensure that its funds control system will only allot actuals.

Notes about this page

  • † Links to public laws are automatically generated and are not guaranteed to be accurate.