Line #SplitDescriptionAmount FootnotesAmountFootnotes
1000DADiscretionary - Actual Unob Bal: Brought forward, October 1Line added $94,744,432.00
1000DEDiscretionary - Estimated Unob Bal: Brought forward, October 1$92,235,846.00
1061Unob Bal: Antic recov of prior year unpd/pd obl$500,000.00 $500,000.00
1740BA: Disc: Spending auth:Antic colls, reimbs, otherLine added $5,050,000.00 See footnotes below
Footnotes for line 1740 (Current):

B3: Amount transferred from 47-0616/2021-2025 pursuant Section 4011 of Public Law 117-2, for the AFRH Transforming Resident-Centered Healthcare Through Modernized Electronic Health Record Systems as recommended by the Technology Modernization Board pursuant to a written agreement between GSA and the Armed Forces Retirement Home.

1920Total budgetary resources avail (disc. and mand.)$92,735,846.00 See footnotes below $100,294,432.00 See footnotes below
Footnotes for line 1920 (Previous):

B1: The majority of the funds will be used for the listed projects: 1) Replace outdated and malfunctioning emergency alert system at both campuses. 2) Repair and replace slate roofs on historic buildings at DC Campus. 3) Modernize 1970s-1980s HVAC systems at DC Campus, reduce energy use. 4) Replace 1950s-1970s fire pump and sprinkler systems at DC Campus to meet current volume and pressure standards. 5) Replace aging and problematic Gulfport keyless access system, integrate Washington onto same system. 6) National Monument Quarters 1 and 2 phase 1 repairs (roof, waterproofing, masonry, HVAC, fire alarm, remediate HAZMAT, replace deteriorated components. 7) National Monument Quarters 1 and 2 phase 2 repairs (stonework, basement plaster, fireplaces, tile, kitchen rehab, security system).

B2: Pursuant to the authority in OMB Circular A-11 section 120.21, one or more lines on the apportionment (including lines above line 1920) may have been round up and as such, those rounded lines will not match the actuals reported on the SF-133. Agency will ensure that its funds controls system will only allot actuals.

Footnotes for line 1920 (Current):

B1: The majority of the funds will be used for the listed projects: 1) Replace outdated and malfunctioning emergency alert system at both campuses. 2) Repair and replace slate roofs on historic buildings at DC Campus. 3) Modernize 1970s-1980s HVAC systems at DC Campus, reduce energy use. 4) Replace 1950s-1970s fire pump and sprinkler systems at DC Campus to meet current volume and pressure standards. 5) Replace aging and problematic Gulfport keyless access system, integrate Washington onto same system. 6) National Monument Quarters 1 and 2 phase 1 repairs (roof, waterproofing, masonry, HVAC, fire alarm, remediate HAZMAT, replace deteriorated components. 7) National Monument Quarters 1 and 2 phase 2 repairs (stonework, basement plaster, fireplaces, tile, kitchen rehab, security system).

B2: Pursuant to the authority in OMB Circular A-11 section 120.21, one or more lines on the apportionment (including lines above line 1920) may have been round up and as such, those rounded lines will not match the actuals reported on the SF-133. Agency will ensure that its funds controls system will only allot actuals.

B3: Amount transferred from 47-0616/2021-2025 pursuant Section 4011 of Public Law 117-2, for the AFRH Transforming Resident-Centered Healthcare Through Modernized Electronic Health Record Systems as recommended by the Technology Modernization Board pursuant to a written agreement between GSA and the Armed Forces Retirement Home.

6011Capital$15,735,846.00 $18,244,432.00
6012Sheridan Building Renovation$77,000,000.00 $77,000,000.00
6013Technology Modernization FundLine added $5,050,000.00
6190Total budgetary resources available$92,735,846.00 $100,294,432.00

Footnotes

Footnotes provide further information about, or establish further legal requirements related to the use of, the funds in a given line or set of lines in an apportionment. If footnotes appear on lines 1920 or 6190, they apply to all the lines in the 1xxx and 6xxx sections, respectively. The following are all the footnotes associated with this file.

NumberText
B1
The majority of the funds will be used for the listed projects: 1) Replace outdated and malfunctioning emergency alert system at both campuses. 2) Repair and replace slate roofs on historic buildings at DC Campus. 3) Modernize 1970s-1980s HVAC systems at DC Campus, reduce energy use. 4) Replace 1950s-1970s fire pump and sprinkler systems at DC Campus to meet current volume and pressure standards. 5) Replace aging and problematic Gulfport keyless access system, integrate Washington onto same system. 6) National Monument Quarters 1 and 2 phase 1 repairs (roof, waterproofing, masonry, HVAC, fire alarm, remediate HAZMAT, replace deteriorated components. 7) National Monument Quarters 1 and 2 phase 2 repairs (stonework, basement plaster, fireplaces, tile, kitchen rehab, security system).
B2
Pursuant to the authority in OMB Circular A-11 section 120.21, one or more lines on the apportionment (including lines above line 1920) may have been round up and as such, those rounded lines will not match the actuals reported on the SF-133. Agency will ensure that its funds controls system will only allot actuals.
B3
Amount transferred from 47-0616/2021-2025 pursuant Section 4011 of Public Law 117-2, for the AFRH Transforming Resident-Centered Healthcare Through Modernized Electronic Health Record Systems as recommended by the Technology Modernization Board pursuant to a written agreement between GSA and the Armed Forces Retirement Home.

The following are all of the footnotes associated with the previous iteration of this file. Note that previous iterations of accounts in this file may come from multiple previous files.

NumberText
B1
The majority of the funds will be used for the listed projects: 1) Replace outdated and malfunctioning emergency alert system at both campuses. 2) Repair and replace slate roofs on historic buildings at DC Campus. 3) Modernize 1970s-1980s HVAC systems at DC Campus, reduce energy use. 4) Replace 1950s-1970s fire pump and sprinkler systems at DC Campus to meet current volume and pressure standards. 5) Replace aging and problematic Gulfport keyless access system, integrate Washington onto same system. 6) National Monument Quarters 1 and 2 phase 1 repairs (roof, waterproofing, masonry, HVAC, fire alarm, remediate HAZMAT, replace deteriorated components. 7) National Monument Quarters 1 and 2 phase 2 repairs (stonework, basement plaster, fireplaces, tile, kitchen rehab, security system).
B2
Pursuant to the authority in OMB Circular A-11 section 120.21, one or more lines on the apportionment (including lines above line 1920) may have been round up and as such, those rounded lines will not match the actuals reported on the SF-133. Agency will ensure that its funds controls system will only allot actuals.